We serve all these areas too.
Buildings from the 1840s–1860s predate galvanized steel and were originally fitted with wrought iron supply and cast-iron waste. In an 1850s Gowanus row house, opening walls may reveal original iron supply — still carrying water but likely heavily corroded internally — original cast-iron DWV, and evidence of later renovation layers: sections of galvanized steel added in the early 1900s, copper branch lines from a mid-century renovation, and possibly PVC drain repairs from more recent work. We document every layer before recommending scope — buildings this old rarely need everything replaced at once.
Industrial conversion rough-ins involve new water supply stacks from the building main, drain installation through or below the concrete slab (or overhead where slab cutting isn't practical), HVAC mechanical work — typically mini-split or hydronic in the loft format — and fixture rough-in for each residential unit. Canal-adjacent buildings in Gowanus often have soil and foundation conditions that affect what's feasible below the slab. We assess site conditions before recommending the drain approach and work with the contractor and structural engineer on the mechanical plan.
Call or send a message. We're about 19 min away.