Saltwater flood exposure accelerates corrosion significantly in galvanized steel supply and at cast-iron DWV joints. After Sandy, buildings that were flooded but not fully repiped often showed rapid pipe failure in the years following — galvanized supply that might have lasted another decade corroded to pinhole failure within 3–5 years of the flood. If the supply lines in your Red Hook building weren't replaced after Sandy, they should be inspected carefully. Cast-iron drain stacks are less affected by flooding than supply lines, but joint sealants and cleanouts should also be checked.
Multi-renovation buildings like many in Red Hook require a systematic assessment: start at the water main entry point in the basement, identify the pipe material there, and trace the distribution from that point. Where walls are open or accessible, we can visually identify galvanized, copper, iron, or PEX. Where they're not, pressure testing across different sections can reveal restriction (suggesting galvanized narrowing) that's useful for planning. A camera through cleanouts maps the drain system. We produce a full assessment before recommending any repipe scope.
Call or send a message. We're about 20 min away.